
09/02/2025
I-89 Exit 19 Southbound off-ramp closure starting at 7am September 2-6 for pavement operations. Please plan ahead for travel this week for appointments. This detour adds about 10 minutes of travel depending on traffic and time of day. As always please give us a heads up if possible if you are running behind schedule. Thank you!
🚧 Traffic Alert – Lebanon 🚧
The I-89 Exit 19 Southbound off-ramp will be closed September 2–6, 2025 for pavement operations.
🔹 Closure begins Tuesday, Sept. 2 at 7:00 AM and lasts 5 days.
🔹 Use Exit 18 SB off-ramp to reverse direction to I-89 NB, then take the Exit 19 NB off-ramp to access Route 4.
🔹 Message boards and signs will guide drivers.
Please stay alert, follow posted signs, and plan extra travel time.
📲 Sign up for free real-time traffic alerts at newengland511.org