11/13/2024
📣📣
To all members, there will be construction activities at the north barns and in the arenas at the announcers' booth on Monday, November 18, starting at 9:00 am.
The contractor will kick-off the following 2 construction projects on Monday, November 18, at 9:00 am (weather permitting):
- 1. Replace the weathered 12 ft 2x4" stud and install new siding in the upper triangular part of the barn #10 south wall
- 2. Replace the existing siding by new siding on the north and south walls of the announcers' booth; replace the rotten 2 x 4" studs of the south wall of the booth and install a new door on the north wall.
Please use caution ⚠️ when working with horses around theses areas.
Thank you!